JJE Series C Type Transformer Clamp

Classification:Overhead Insulating Fittings

Inside Road & Administration Industry & Trading Garden,Houshan Industry Area,Fuzhou City,Fujian Province

0591-22806687 0591-22806697

0591-22806667

bs@china-grid.com.cn

Item-detail
Description:

The C-clamp for transformer is made of special aluminum alloy, which has strong conductive properties, and is suitable for both copper conductors and copper-aluminum transition conductors. This clamp is mainly used to connect and disconnect the studs and wires from transformers, switches and other equipment.

One end is not completely closed with the internally threaded post connected, and the other end is connected with the wire. The hinged block connects the internally threaded round pipe with the wire. The partially closed threaded round pipe has elasticity and can store and release the wire and stud. Energy caused by thermal expansion and contraction

When the load increases, the thermal barrier of the wire expands, and the threaded tube will be slightly flattened. When the wire is contracted, the threaded tube is retracted due to its elasticity, and the constant contact pressure is maintained (co-breathing effect).

The hinge block installed between the threaded tube and the wire can produce a very high side pressure under a certain action, so that the C-type clamp and the wire, and a sufficient contact pressure with the transformer and the stud, so that the transformer screw The column completely matches the internally threaded tube, which greatly increases the contact surface between the transformer stud and the C-clamp, and maintains stable contact performance.

Applicable voltage level: 380v, 10kV, 110kV, 220kV, 330kV, can be used to connect aluminum head to aluminum wire, aluminum head to copper wire, aluminum head to aluminum wire

Features:

1. Breathe with wires and leads,eliminate the thermal discharge failure of the wire and equipment connection

2. Effectively reduce contact loss

3. Greatly reduce the huge loss of equipment and power outage caused by thermal failure

4. Installation is very convenient, fast and greatly reduces human factors

5. Maintenance-free and maintenance-free to improve the investment efficiency of funds

6. No special tools are needed, which can improve the investment benefit of funds

7. Greatly increases the contact surface between the equipment and the wires, improving the service life

8. Long-term reliable and safe operation of bit lines and equipment provides strong guarantee

Model Applicable Stud Applicable Conductor Wire Diameter
(mm)
Model Applicable Stud Applicable Conductor Wire Diameter
(mm)
SP-B50 M12 LJ(TJ)25 6.36 SP-B94 M20 LJ(TJ)150 15.75
SP-B51 M12 JKLYJ35 7 LGJ120 17.74
LJ(TJ)35 7.5 SP-B95 M20 LJ(TJ)120 14.25
LGJ35 8.16 LGJ95 13.6
SP-B52 M12 JKLYJ50 8.3 SP-B71 M16 LJ(TJ)35 7.5
LJ(TJ)50 9 LGJ35 8.16
LGJ50 9.6 LJ(TJ)50 9
SP-B53 M12 JKLYJ70 10 SP-B72 M16 LGJ70 11.4
LJ(TJ)70 10.8 LJ(TJ)70 10.8
LGJ70 11.4 JKLYJ70 10
SP-B54 M12 LJ(TJ)95 12.12 LGJ50 9.6
LJ(TJ)120 14.25 SP-B73 M16 LJ(TJ)95 12.12
SP-B55 M12 LJ(TJ)150 15.75 LGJ95 13.6
JKLYJ185 16.2 LJ(TJ)120 14.25
LJ(TJ)185 17.5 SP-B74 M16 LJ(TJ)150 15.75
SP-B56 M12 LJ(TJ)240 20 LGJ120 15.74
SP-B61 M14 LJ(TJ)35 7.5 SP-B75 M16 LJ(TJ)185 17.5
LGJ35 8.16 LJ(TJ)150 17.1
LJ(TJ)50 9 JKLYJ185 16.2
SP-B62 M14 LGJ70 11.4 SP-B76 M16 LGJ185 18.9
LJ(TJ)70 10.8 JKLYJ240 18.4
JKLYJ70 10 SP-B77 M16 LJ(TJ)240 20
SP-B63 M14 LGJ50 9.6 SP-B81 M18 LJ(TJ)35 7.5
LJ(TJ)95 12.12 LGJ35 8.16
LGJ95 13.6 LJ(TJ)50 9
LJ(TJ)120 14.25 SP-B82 M18 LGJ70 11.4
SP-B64 M14 LGJ120 15.74 LJ(TJ)70 10.8
LJ(TJ)150 15.75 JKLYJ70 10
SP-B65 M14 LGJ150 17.1 SP-B83 M18 LJ(TJ)120 14.25
LJ(TJ)185 17.5 LGJ95 13.6
SP-B66 M14 LGJ185 18.9 LJ(TJ)95 12.12
JKLYJ240 18.4 SP-B84 M18 LJ(TJ)150 17.75
SP-B67 M14 LJ(TJ)240 20 LGJ120 17.74
SP-B91 M20 LJ(TJ)240 20 SP-B85 M18 LJ(TJ)185 17.5
SP-B92 M20 LGJ185 18.9 LGJ150 17.1
JKLYJ240 18.4 JKLYJ185 16.2
SP-B93 M20 LJ(TJ)185 17.5 SP-B86 M18 LGJ185 18.9
LGJ150 17.1 JKLYJ240 18.4
JKLYJ185 16.2 SP-B87 M18 LJ(TJ)240 20
Installation:

1. Determine the model: Carefully check whether the wire is consistent with the model marked on the clamp, such as: Model ZJC-B51, M12 means that the transformer's lead screw is M12, and JKLJ35 is the outgoing wire

2.Fix the "g" -shaped element: screw it clockwise to the transformer screw, and the "g" -shaped element can be screwed and extended outward. Provisions: The female block is matched with the side of the transformer arc, the male block is matched with the wire, and the hinge block is taken out to form it (the two hinge blocks are turned into a certain angle)

3. Put the wires and bolts in place: Put the wires into the "g" -shaped grooves, and put them into a bow-shaped hinge connection according to the arc surface. You can insert the bolts on the back so that the bolts are in the middle position on the top of the hinges. Tighten the bolts with a wrench.)

4. Make sure that it is installed properly: When tightening the bolt, the last few threads should have a clear sense of force. Press the hinge clamp flat and press against the "g" -shaped element. The "g" element should be slightly deformed. (After installation, pull the wire and pull out by pulling or pulling to see if the wire and the pull out are tight)

5. Disassembly: Loosen the bolts, insert a screwdriver between the pressing block and the "C" element, and pry up with force to arch the pressing block upward.

Contact Us
0591-22806687 0591-22806697
0086-13950298099
0591-22806667
Inside Road & Administration Industry & Trading
      Garden,Houshan Industry Area,Fuzhou City,Fujian Province
Sampras@china-grid.com.cn
Product Search

© CHINA-GRID POWER TECHNOLOGY CO.,LTD. All Rights Reserved. 闽ICP备16015067号-2